Billing Termination Agreement and Shut-Down Procedure
This is the standard agreement with all satellite
customers, please note the procedure in shutting down.
Dear Iron Link Communications Customer:
Please
be advised that in order for Iron Link Communications to terminate a service
and discontinue billing you (the customer), it is necessary for you shut down
the remote site transmission. Iron Link Communications will continue
billing you for the service until the following procedure is followed and confirmed
via email:
- On the transceiver – disable the transmit and save configuration
- On the modem
- disable the transmit
- lower power to minimum (usually -35.0dbm)
- change TX FREQUENCY to minimum (usually 50.000mhz)
- disconnect the TX IF cable at the back of the modem
It is not
enough to simply power down all the equipment. The above procedure must
be followed and confirmed in order for billing to terminate.
Iron Link
may provide a TEST circuit (if available and offered) in order to protect the
customer’s investment. If you are on a TEST circuit - the test
circuit is for THREE BUSINESS DAYS – after that point, it needs to be
shut down with above procedure. If test circuit is not shut down after
three days, billing will commence and you agree to pay the LIST price for the
test circuit.
Please be advised
that all agreements require 30 day cancellation notice via email. If
you would like to cancel or shrink services, we require 30day notice.
Thank you
Iron Link Communications |